Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Electrical Engineering | TR Engineering Consultancy LLC

Electrical Engineering

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).

Electrical Engineering

Design and engineering services for power plants (open cycle, co-generation, combined cycle), grid substations for utilities, distribution system for oil & gas sector, petrochemical and industrial complexes. The design and engineering services include the following:

  • Power distribution systems consisting of EHV, HV, MV and LV Systems
  • Indoor AIS, GIS and outdoor switchyards for utility companies, power evacuation substations and industrial complexes
  • Power generation plants – GTG, STG & Diesel plants
  • Protection and metering diagrams for 400kV/220kV grid substations, CT&VT dimensioning, Control and Protection block logic diagrams, Substation Automation/Control System
  • Optimized ground grid design solution and cable sizing using design software
  • Protection studies, relay coordination & setting schedule
  • Power Factor Improvement Capacitor (PFIC) sizing, Harmonic Filters and Static Var Compensator dimensioning
  • Electrical system studies such as load flow, short circuit, motor starting, transient analysis, harmonic analysis using ETAP, EDSA, CYME & DigSilent
  • Other studies such as Trip Analysis, Root Cause Analysis of failures and accidents, Safety Audit
  • Third party services for inspection and witnessing FAT, SAT etc.