Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Sohar Asphalt LLC Awards Bitumen Project to TRE | TR Engineering Consultancy LLC

Sohar Asphalt LLC Awards Bitumen Project to TRE

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 828 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).

Sohar Asphalt LLC intends to install a grass root refinery in Sohar Industrial Port area to process 30000 BPSD of heavy crude to produce bitumen as the main product and atmospheric and vacuum distillates as the other products. TR engineering has been engaged to develop basic engineering and FEED for the entire project. The project facilities include Atmospheric  and vacuum distillation units, sour water stripper unit, storages, associated utilities and off sites. Crude oil will be imported and bitumen and the distillate products will be exported by sea.