Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Introduction to TRE Services | TR Engineering Consultancy LLC

Introduction to TRE Services

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 828 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).

We provide Engineering design support for mainly Oil and Gas, Refinery and Petrochemical plants. Our Engineering services spread through a spectrum of activities starting from concept and feasibility studies, Front End Engineering, Detailed Engineering upto construction and commissioning support.

The engineering team plays a vital role in conceptualizing and leading multi-discipline projects ensuring technical integrity by adhering to the client’s codes and standards to the best satisfaction of the client.

As PMC we manage the multiple interfaces between the Project Offices and Site, other Contractors, Local Administration, providing uniformity and consistency in execution. This is accomplished by this using proven management practices that include implementing a common set of standards for the Project, setting up effective communication and reporting systems, planning work in integrated manner and monitoring and controlling any changes that impact the Project with its interfaces.

We offer the best highly qualified project team candidates within our organization for this type of work and ensure continuity of key personnel a major factor to ensure PROJECT success.

We fully adhere to HSE commitment and will promote an HSE culture within its organization as well as within the EPC CONTRACTOR, Subcontractors, Vendors and any Third Party Organization involved in the Project to secure the goal of ZERO accidents and incidents in Environmental protection during the complete life of the Project.